Small footbridge the Netherlands

In April 2020, a truck damaged a wooden bicycle bridge. The cyclists have used a diversion route for several weeks, but recently a standard modular steel bicycle bridge has been installed as a temporary solution on the location of the old bridge.

 

The customer, the municipality of Heusden, chose this temporary solution because the bridge was available and to be able to open the tourist route again.



 

Share on:

Project details

Solution
Pedestrian bridge
Type
JPB-P
Bridge length
24 mtr
Road width
3 mtr
Weight
21 tonnes
Permissible traffic load
5 kN/m²
Pedestrian bridge