Flyover bridge for special transports in Nieborowice

In order to secure the existing bridge over the Bierawka River in the town of Nieborowice during the transport of oversized loads destined for the power plant in Rybnik, a temporary JSK450 bridge of 21m length was used in the role of a 'Flyover' bridge, i.e., a bridge over the existing bridge. Installed and dismantled several times in the same location during consecutive nighttime passages, it allowed for the safe passage of loads weighing several hundred tons.

Share on:

Project details

Solution
Beam Bridge
Type
JSK-JBB
Length
21m + ramps
Width
6,3m
Capacity
Super heavy transports
Beam Bridge