Temporary Ro-Ro platform in Szczecin

In order to unload two 400t tanks from a barge moored in the port of Szczecin, our Client decided to use elements of the JSK temporary bridge with a length of 28m (span of 21m and ramp of 7m) and a width of 11.4m.

Share on:

Project details

Solution
Beam Bridge
Type
JSK-JBB
Length
28m
Width
11,4m
Load
400t.
Beam Bridge