Fjøsangerveien (E39) temporary footbridge, Bergen
Our client was looking for a temporary footbridge in the city of Bergen. All bridge spans, platforms and stairs were produced in the Netherlands and transported preassembled to Bergen. All was assembled by the Statens Vegvesen. Design was made by Janson Bridging engineering and approved by the National Road Authorities.

Project details
Solution
                Pedestrian bridge
            Type
                JPB-P
            Width
                3 m
            Capacity
                5 kN/m2
            Tare weight
                165 ton
            Bridge length
                156 m
             